Fairhope, Alabama
ESMPO PROJECT
Construction of a 10,000 foot sidewalk from Mullet Point south along CR1 is underway now.
The $515K, Eastern Shore Metropolitan Planning Organization project is being funded by a federal Transportation Alternative Program grant, with a 20% match from Baldwin County.
CR 1 south of Mullet Pt. park |
ESMPO PROJECT
Construction of a 10,000 foot sidewalk from Mullet Point south along CR1 is underway now.
The $515K, Eastern Shore Metropolitan Planning Organization project is being funded by a federal Transportation Alternative Program grant, with a 20% match from Baldwin County.
Comments
https://www.nbcnews.com/news/nbcblk/how-itta-bena-mississippi-became-banking-desert-n1017686