Problematic Sewer Pump Station Upgraded

Fairhope, Alabama 

 

Valley station today.


Raised manhole to reduce leaks.

 VALLEY/MIDDLE STREET AREA

Capacity upgrades have been completed at the sewage lift station on Valley Street where frequent overflows have occurred in recent years. 

The new pump is located underground rather than above ground as before; a nearby manhole on Middle Street that frequently overflowed has been elevated considerably as well to reduce leakage.

This is one part of the ongoing serer collection system upgrades that began about four years ago. Total cost was $247K for this one.


Before.

Before.


Comments

Anonymous said…
A second sewer is so badly need .
Anonymous said…
There are still many upgrades in this town needed but also needed is control and planning for growth that is out of control. If you have a group of people believing that if you have property that you should be able to do whatever you want to with it then there will never be any control. Just call this town “A FREE FOR ALL”!!!!!
Anonymous said…
The smell is terrible around these things especially the one located above South Park. Disgusting.